SepticCalc is intentionally transparent. Every number it returns comes from a published onsite-wastewater design rule, not a black box. Here is exactly how each output is computed.
1. Design daily flow
Codes estimate wastewater flow from bedrooms (an occupancy proxy), commonly about 150 gallons per bedroom per day. A 3-bedroom home is therefore designed for ~450 gallons/day. Your county may use a different figure — North Carolina, for example, uses 120 gpd/bedroom.
2. Septic tank size
The tank is the largest of: a code minimum by bedroom count (1,000 gal up to 3 bedrooms, ~1,250 at 4, ~1,500 at 5), two days of design flow, and your state's minimum. A garbage disposal adds capacity. The result is rounded up to a standard tank size.
3. Drainfield (leach field) area
Drainfield area = design flow ÷ the soil's long-term acceptance rate (LTAR), the gallons each square foot can absorb per day. These LTAR values follow the EPA Onsite Wastewater Treatment Systems Manual and the percolation-rate correlations most state codes use:
| Soil | Typical perc | LTAR (gpd/ft²) |
|---|---|---|
| Gravel / coarse sand | <5 min/in | 1.2 |
| Sand | 5–15 min/in | 0.8 |
| Sandy loam | 16–30 min/in | 0.7 |
| Loam | 16–30 min/in | 0.6 |
| Silt loam | 31–45 min/in | 0.45 |
| Clay loam | 46–90 min/in | 0.3 |
| Clay | 91–120 min/in | 0.2 |
| Tight / structureless clay | >120 min/in | n/a |
4. System type
A decision tree recommends the system: a shallow water table or bedrock points to a mound; soil too tight for conventional acceptance points to an aerobic (ATU) unit; otherwise a conventional gravity system is the default.
5. Pumping interval
The estimated years between pump-outs scale with tank capacity and household size: a larger tank holds more sludge before it threatens the outlet, and more occupants fill it faster. We assume an occupancy of bedrooms + 1 and a sludge-accumulation rate consistent with the widely-used EPA / university extension pumping tables — so a 1,000-gallon tank for a family of four lands near every 2–4 years, and a 1,500-gallon tank near 3–5 years.
6. Installed cost
Cost is built from transparent line items — soil/perc test, design & permit, tank, drainfield (area × a per-ft² rate by system type), any treatment unit, and excavation — then scaled by a regional cost index for your state. The figures are calibrated to published 2026 contractor ranges (conventional ≈ $3,500–$8,500; mound and aerobic ≈ $10,000–$20,000), and the low–high band reflects normal contractor variation. You can compare all four system types side by side for your inputs.
Limitations
This is a planning estimate, not a permitted design. A real permit requires a site-specific soil or percolation test and a design accepted by your local health department. Always confirm with a licensed septic professional before budgeting or building.